Home » Newsroom » Metal powder recovery made easy.

Metal powder recovery made easy.

You are currently viewing a placeholder content from Youtube. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

More Information

The PowTReX is a vacuum, transfer, sieving and recovery system for metal powders, developed for use in the ​​additive manufacturing (AM) industry.
It is used to transport metal powder from, for example, 3D printers and unpacking stations with a high and constant suction power. The extracted powder is sieved and the material with the appropriate particle size can be automatically returned to the process.

The system has a small footprint of less than 1 m² and offers a high and stable material throughput. The PowTReX is a reliable, safe and easy to use system which utilises a HEPA filter for protecting against harmful substances. Installation in an EX zone 22 is also possible because it is an ATEX-approved system with type-tested components. It is operated using a touch display and one-button operation.

Formnext 2019 Volkmann GmbH Stand PowTReX Metallpulverhandling
PowTReX (left) at the fair. Formnext 2019 / Frankfurt am Main

With this system, classification of all common types of metal powder and their alloys for additive manufacturing is possible (including stainless steel, aluminum, titanium, amongst others). Operation under fully inert conditions with a residual oxygen content of <1% is also possible, as is a complete closed loop solution for the inert gas recirculation.

You can find more information about solutions for “Additive Manufacturing” in our area >> here.

#PowTReX #MetalPowder #Classification #AM #3Dprint #UnpackingStation #ATEX #Argon #Inert

Travel to Volkmann GmbH in Soest impaired due to roadworks

Visits to Volkmann GmbH in Soest will be considerably affected by roadworks over the next few weeks. The approach via the A44 motorway is particularly affected. A diversion will be set up, which will extend the journey by approx. 2 km or 5-10 minutes. The normal route from Volkmann to the motorway will remain open.

The construction site and the diversion have been announced by the city of Soest for the period from 23 April to 17 July 2024.

We show a map with the diversions route on page:
https://volkmann.info/en/company/contacts_directions/